Ongoing Projects
Engineering Professionals and Consultancy Services
Design of Mining and Production Plan for Calcite-Dolomite (Marble) Quarry Complex, Embilipitiya, Sri Lanka.
Location: Embilipitiya, Sri Lanka
Extent: The extent of the project area was 26 Hectares
Physiography: High elevation and difficult terrain
Scope of Work:
- Geological Exploration:
- Geological investigation to demarcate ore reserves of dolomite, calcite (Marble), and the waste rock material.
- Preparation of a geological map at a scale of 1: 5,000 in addition to the topographic map, in both electronic and paper.
- Chemical analysis of the raw material to identify quality, grade, and possible industrial applications.
- Ore Reserve Estimation
- Carrying out a drone survey to develop a Digital Elevation Model (DEM) of the area
- Carrying out Total Station Survey to quantify caved/mined areas.
- Ore reserve estimation through the drone mapping, total station survey & photogrammetry software tools.
- Mining site safety assessment and Safety plan
- Identification of existing safety issues and plan for eliminating hazards due to irregular mining activities.
- Existing safety issues–Geo-Hazards, Groundwater and Unsystematic excavations of underground galleries and chambers
- Assessment of the conditions of host rock and the supportive system
- Safety establishment for all operatives
- Proposal for safety enhancement for the surrounding community
- Mine development
- Mine site preparation and infrastructure development plan
- Drilling, charging, blasting, secondary disintegration, and mucking proposal.
- Proposal for the usage of waste rock
- Production and disintegration plan
- Estimation of solid rock quantity required for blasting in mine development work
- Setting the preparational stage for mining – Removal of Overlying Rock Span
- Overburden / Waste rock removal in the mining process/stage
- Development of operational time frames for drilling, blasting mucking, and product transportation activities.
- Employment of product disintegration and processing activities.
- Traffic Analysis
- Designing the access roads into the mine and out from the mine site
- Drawing up the anticipated road maintenance plan
- Manpower employment proposal and utilization of machinery and equipment
- Planning for Manpower engagement for mining operations
- Reassessment of machinery and equipment requirements
- Impact analysis and adoption of remedial measures
- Preparation of tailings /mine waste disposal
- Identification of anticipated sociological influence of proposed mining activities
- Mine closure and mine site rehabilitation proposal
- Drawing up the mine closure and rehabilitation plan
- Detailed Proposals for Corporate Social Responsibility (CSR)
- Drawing up recommendations for corporate social responsibility
Activities accomplished
- Geology of the ore deposit
- Ore reserve estimation
- Existing Mine Safety issues
- Mine development plan
- Mine Production Plan
- Mine Rehabilitation plan
Outcome of the project: Preparation of Mining and Production Plan with the economic viability report for Calcite-Dolomite (Marble) Quarry Complex, Embilipitiya, Sri Lanka
Project value: OMR-1556